标志Shaping Tomorrow's Built Environment Today

标准 and 的指导方针 Under 持续的维护

分享这

标准 and 的指导方针 Under 持续的维护

Access the online comment database to submit continuous maintenance proposals on standards and guidelines on continuous maintenance. A complete list of standards and guidelines under continuous maintenance can be found in the online database.

Under continuous maintenance procedures anyone may propose changes at any time. Each change will be considered by the appropriate Standing Standard Project Committee (SSPC) or Standing Guideline Project Committee (SGPC), according to a definite schedule, 如第2条所示. The project committees may also propose changes.

立即访问数据库


How to Submit a Proposed Change to a Standard or Guideline

  1. INSTRUCTIONS FOR SUBMITTAL OF PROPOSED CHANGE TO 九州体育官方 STANDARD OR GUIDELINE UNDER CONTINUOUS MAINTENANCE

    Specific changes in text or values are required and must be substantiated. 九州体育官方 Staff will notify the submitter any change proposals that do not meet these requirements. Supplemental background documents to support changes submitted may be included, preferably in wordprocessed (MS Word preferred).

  2. If a provision is proposed to be added or deleted, the text of the provision must be submitted in writing at osr.ashrae这样.org. If modification of a provision is proposed, the proposed text must be submitted utilizing the strikeout/underline format. (Strikeout text to be deleted and underline text to be added.) Please do not submit marked-up or highlighted copies of the standard.

  3. INFORMATION ON REVIEW AND DISPOSITION OF PROPOSALS

    All submittals received by 九州体育官方 are acknowledged by the online system and forwarded to the Project Committee for consideration. The Project Committee will inform submitters of the disposition of their substantive proposals. SSPC or SGPC consideration will be given to proposed changes within thirteen (13) months of receipt.

    请注意:  A login is required to submit a continuous maintenance change proposal and/or to access those proposals submitted previously. Please login with your existing 九州体育官方 Member or Non Member login or if you do not have an 九州体育官方 account you can create a new login.

    • Project Committee members must use their 九州体育官方 Member login in order to access the continuous maintenance proposals and to draft replies to those proposals for which their project committee is cognizant.
    • Proposers will need to use their login to view their proposals and view project committee responses to their proposals.

Instructions for Submitters, PCs, and Chairs

pdf_icon.png 持续的维护 Instructions Submitters (Screenshots)

pdf_icon.png 持续的维护 Instructions Submitters (NoScreenshots)

pdf_icon.png 持续的维护 Instructions PC and Chair (Screenshots)

pdf_icon.png 持续的维护 Instructions PC and Chair (NoScreenshots)

关闭